Why is it important to get manufacturing involved early in the PCB design process?
What lesson was NOT learned through Ian’s design experience?
Which stakeholder is responsible for maximizing PCB manufacturing speed and cost efficiency?
Which stakeholder is responsible for creating the fabrication and assembly drawings?
What industry standards define standardized schematic symbols and reference designators?
What item should NOT be considered during a schematic creation?
Which IPC standard should you reference for generic PCB Designs?
What should you consider throughout the PCB Layout?
What should you discuss with your test group before you begin the PCB Layout?
For complete testing, how many test points should be included in the design?
Which is NOT an acronym used in JTAG testing?
What is the thickness of a half-ounce copper layer?
What should you never allow the PCB fabricator to adjust to control impedance in the stackup?
Copper Places can serve which of the following purposes?
In what order should you route the PCB design?
Which of the following is not included in a fabrication drawing?
What should be included in the Fabrication Notes?
What should NOT be included in the Assembly Drawing?
What item should be included in the assembly data package?
Which IPC Specification should you reference to ensure quality during final inspection?