EMA Resources

Video

Home > EMA Resources > Videos > How to Run IR Drop Analysis for Parallel Bus Voltage Rails
VIDEO

How to Run IR Drop Analysis for Parallel Bus Voltage Rails

Learn how to identify potential voltage drop issues in the interconnects of the Power Delivery Network using Sigrity Aurora.
VIDEO

How to Run IR Drop Analysis for Parallel Bus Voltage Rails

Duration: 00:05:52

Sigrity Aurora enables signal and power integrity analysis in the familiar OrCAD and Allegro design environment to achieve an analysis-driven PCB design flow. In this video, we will discuss how to identify potential voltage drop issues in the interconnects of the Power Delivery Network using Sigrity Aurora. In this video, you will learn:

  • How to set up the design for simulation in Sigrity Aurora
  • How to assign DC Voltages to nets
  • How to add source and sink components
  • How to perform IR Drop Analysis
  • How to analyze the simulation results

Follow along with these demo files here.

For part 2 of this video series and learning how to apply IR Drop constraints in the design, click here.

For step-by-step instructions on how to use the workflows included in Sigrity Aurora, view our free workshops at EMA Academy.

More Videos

Contact Us

EMA Design Automation